The shore power socket box is arranged at the front of the shore wharf and is used for docking with the plug of the shore power cable connection device on the ship side.
According to the characteristics of different docks, the socket box can be arranged in the foundation pit at the front of the wharf or above the ground.
For the process form where the shore side provides the connection cable, the socket box is arranged on the side deck of the ship, and the shore side cable connection system pulls the cable to the ship side for connection with the socket box on the ship side.
Meet the requirements of IEC and JTS standard shore electrical interface,
The dimensions can be customized according to the actual situation of the user
Mechanical interlocking interface device for standard shore power connection;
Provide standard optical fiber communication interface;
Above ground installation or ground well is available
The installation form meets the requirements of ARC protection for IEC shore electrical interfaces:
Container terminal berths;
Ore bulk cargo dock berth;
Coal bulk cargo dock berth;
Passenger transport terminal berths;
Address: Unit5,No.655 Jin Bi Road,Feng Xian District,Shanghai,China
Tel:86 021-57180510
Email:info@revool.cn