Revool provides shore-based power supply integration services for port users
The shore power cable and the cable reel are called cable management system
The ship based shore power cable management system will be installed on the ship side, it used to be installed on the up-deck of engine-room; or it can be installed on the deck close to the stern area;During ship calling the terminal, the cables will be reeling out from the cable reel, the cables with plug assembled will be reaching the socket box one the shore side and plug-in to close the shore power circle;During ship departure, the cable reel will be in operation of reeling in and all the cables will be stored in the drum, cables will be properly protected for next oper
The shore power socket box is arranged at the front of the shore wharf and is used for docking with the plug of the shore power cable connection device on the ship side.According to the characteristics of different docks, the socket box can be arranged in the foundation pit at the front of the wharf or above the ground.
The shore-based swing-arm cable management system is installed at the front of the shore-side wharf and located at the front of the wharf.During the docking of the ship, the swing-arm cable management system swings the overhang arm to the side of the ship by turning or expanding, and the shore power connection plug is close to the shore power connection on the side of the ship to realize the connection of shore power.
As the position of the cruise ship docked at the dock varies, the connection point that provides shore power to the ship will be at a different location on the dock. The Mobile Shore Power Cable Connection Device (SCMOBILE) provides a flexible and convenient solution for the connection of cruise shore power cables to meet the shore-based power needs of various cruise ships in accordance with IEC80005-1. Mobile shore power cable connection equipment can provide 11KV@16MVA shore power transmission
Proven by years of pragmatic approach, solid performance figures and profitability, Tratos has indeed created sustainable value for its employees, shareholders' regions and governments Tratos will continue to provide superior and reliable technical support including complex design advice and engineering solutions, working together with our customers.
ADVANTAGE
Strong Partnerships
Reliability & Efficiency
Environmentally Solutions
Address: Unit5,No.655 Jin Bi Road,Feng Xian District,Shanghai,China
Email:info@revool.cn
TEL:86 021-57180510
FAX:86-021-57180515
Post code:201404
Revool provides shore-based power supply integration services for port users
The shore power cable and the cable reel are called cable management system
The ship based shore power cable management system will be installed on the ship side, it used to be installed on the up-deck of engine-room; or it can be installed on the deck close to the stern area;During ship calling the terminal, the cables will be reeling out from the cable reel, the cables with plug assembled will be reaching the socket box one the shore side and plug-in to close the shore power circle;During ship departure, the cable reel will be in operation of reeling in and all the cables will be stored in the drum, cables will be properly protected for next oper
The shore power socket box is arranged at the front of the shore wharf and is used for docking with the plug of the shore power cable connection device on the ship side.According to the characteristics of different docks, the socket box can be arranged in the foundation pit at the front of the wharf or above the ground.
The shore-based swing-arm cable management system is installed at the front of the shore-side wharf and located at the front of the wharf.During the docking of the ship, the swing-arm cable management system swings the overhang arm to the side of the ship by turning or expanding, and the shore power connection plug is close to the shore power connection on the side of the ship to realize the connection of shore power.
As the position of the cruise ship docked at the dock varies, the connection point that provides shore power to the ship will be at a different location on the dock. The Mobile Shore Power Cable Connection Device (SCMOBILE) provides a flexible and convenient solution for the connection of cruise shore power cables to meet the shore-based power needs of various cruise ships in accordance with IEC80005-1. Mobile shore power cable connection equipment can provide 11KV@16MVA shore power transmission
Proven by years of pragmatic approach, solid performance figures and profitability, Tratos has indeed created sustainable value for its employees, shareholders' regions and governments Tratos will continue to provide superior and reliable technical support including complex design advice and engineering solutions, working together with our customers.
ADVANTAGE
Strong Partnerships
Reliability & Efficiency
Environmentally Solutions
Address: Unit5,No.655 Jin Bi Road,Feng Xian District,Shanghai,China
Email:info@revool.cn
TEL:86 021-57180510
FAX:86-021-57180515
Post code:201404